Icons here let you switch between modes:
Disclaimer: Always refer to the specific wiring diagrams provided with your power plant rack, as physical configurations may vary by installation. smartpack2 touch user manual
: Always disconnect external supply circuit breakers and internal battery/load fuses before starting any electrical installation. Icons here let you switch between modes: Disclaimer:
Conducts routine discharge tests to evaluate real capacity and detect failing cells before a critical outage occurs. Main Menu → Sys
Main Menu → Sys. Config → Power System → General System Config → Reference Voltage Main Menu → User Options → Battery Info Check Alarms
| Part | Qty | |------|-----| | PTFE cover tape (10mm x 10m) | 1 roll | | Thermocouple type K | 1 pc | | Fuse (5x20mm, 2A slow-blow) | 5 pcs | | Touchscreen protective film | 2 sheets |
: Detailed guide (Doc. No. 370013.063) for establishing direct network connections and setting parameters like float voltage and battery charge limits. Key Operational Steps