Gunnebo Speedstile Fl Installation Manual !free! -
Proper site preparation is critical for the long-term stability and functionality of the SpeedStile units. : Concrete resistance : Minimum Bolting depth : Minimum 70mm. Foundation size : Minimum 2000mm x 500mm x 150mm deep.
This section transforms the installer’s role from that of a mechanical fitter to a system integrator. The manual guides the user through the Input/Output (I/O) connections, specifying voltage requirements and relay logic. It addresses the critical fail-safe requirements, such as the "Break-out" mode, where glass barriers must drop or open during a fire alarm to ensure unimpeded egress. The technical precision required here is paramount; a misinterpretation of the wiring schematic could lead to life-safety code violations. Furthermore, the manual touches upon the Dip-switch settings or software configuration for lane direction and sensor sensitivity. This demonstrates that the installation is not complete until the "brain" of the turnstile is calibrated to the specific behavioral needs of the site, such as adjusting the sensitivity for tailgating detection versus throughput speed. gunnebo speedstile fl installation manual
Standard 230Vac, 50Hz (with a 115Vac, 60Hz option available). Power Consumption: Standby: Approximately 60VA to 120VA. In Operation: Up to 300VA to 345VA. Logic Voltage: Operates on 24V DC . Proper site preparation is critical for the long-term